↓ Skip to Main Content
  • web login
  • meeting_schedule
  • equipment_schedule
  • QingLabSchedules
  • MSDS

The Qing Research Group at ASU

Main Navigation

  • Home
  • People
    • Principal Investigator
    • Students
    • Post-docs and visiting scholars
    • Former Members
    • Where we are
  • Research
  • Publications
  • Teaching
  • News
  • Blogs
  • Contact

Tag: Protocols

Lesker 3 Ebeam Evaporator Operation Protocol

By ctsao3 Posted on September 19, 2018 Posted in Tagged with Protocols

Lesker 3 Operation Protocol   Outline: A. Deposition material loading B.Sample loading C.Evaporation     A. Deposition material loading In case the software needs to be restarted; from the desktop, click on “Shortcut to Cware”, then “Login Here” and use …

Lesker 3 Ebeam Evaporator Operation Protocol Read more »

Footer Menu

  • web login
  • meeting_schedule
  • equipment_schedule
  • QingLabSchedules
  • MSDS
© 2022 QingLab @ ASU Physics | Powered by Responsive Theme